Increasing Productivity in CPO Production Using The Objective Matrix Method Defi Irwansyah; Cut Ita Erliana; Fadlisyah Fadlisyah; Mutammimul Ula; Mahlil Fahrozi; Rofiq Harun
International Journal of Engineering, Science and Information Technology Vol 2, No 2 (2022)
Publisher : Master Program of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (345.087 KB) | DOI: 10.52088/ijesty.v2i2.232

Abstract

PT. Ika Bina Agro Wisesa (IBAS) is a company that produces products in the form of crude oil or CPO (Crude Palm Oil). The company sets a minimum production target of FFB that must be processed to reach 30 tons in one boiling with a minimum production target of 600 tons/day. The company is required to increase productivity. The problem so far is that the company has never measured the productivity of the production process, which will then affect the achievement of production targets. Measurement of productivity is critical because the measursizeoductivity can determine whether the company meets productivity targets for production or not. Therefore, it is necessary to measure productivity to assess the value of productivity and efforts to increase productivity in CPO production and how to increase productivity in CPO production and efforts to increase productivity using the Objective Matrix (OMAX) method at PT. Ika Bina Agro Wisesa. Analysis of productivity using the OMAX method, ratio 3 (labor productivity) and ratio 4 (machine productivity) has a very high percentage of poor performance, which means that ratio and 4 have an insufficient level of productivity. Unlike the case with the achievement of productivity ratio 1 (productivity of raw materials) and ratio 2 (productivity of working hours) wh, ich shows a low percentage of poor performance, which means that the productivity level of ratio one and ratio 2 has a better productivity level than ratio three and ratio 4 Analysis The results of the productivity index in the company decreased and increased for each month, in November it experienced a decrease of -79.49, while in December it experienced a significant increase in the amount of 595.02 and January at 69.98. in February decreased to -23.63. Furthermore, productivity in March - September 2021 was unstable, with an increase and dropped for July, a decrease of -0.64 and, a slight increase in August of 0.28.
Measurement of Warehouse Layout at Rice Refinery Using Shared Storage Method Defi Irwansyah; Cut Ita Erliana; Fredy Fariska Fahrudin; Muhammad Alfian
International Journal of Engineering, Science and Information Technology Vol 2, No 4 (2022)
Publisher : Master Program of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52088/ijesty.v2i4.307

Abstract

PT. Kilang Padi Mutiara Refinery is a company engaged in rice production that produces rice, groats, and bran. The main product of this factory is rice. It can be seen in storage warehouse activities that they still experience problems with poor product placement due to irregular distances between placement and delivery areas caused by the preparation of products that are not based on inventory so that the products in the warehouse become narrower and seem messy, this triggers the accumulation of excess products. to damage the finished product packaging. Based on the existing problems, in this study, planning for layout improvements using the shared storage method was carried out to increase the effectiveness of the distance between doors to the storage area and better product placement. the steps of re-planning using the shared storage method begin by knowing the warehouse area, warehouse capacity, and other warehouse data, as well as collecting data by determining space requirements, determining space allowances, and the distance of the entrance to the storage area. From the data processing, the distance becomes more regular and can be known every distance. Based on the comparison of the initial layout and the proposal, it is known that the distance in the initial layout is 719.56 meters, while for the proposed layout using the shared storage method, the results are 593.33 meters with 13 product areas, with this loading and unloading activities become better and more effective.